The main and redundant rooms each hold a complete set of repeaters, combining platform and optical master unit, feeding the remote units in every area over two independent fibre routes, A and B. A room can fail or a cable be cut, and the system runs on.
Each area's remote unit connects to both route A and route B; the mast antenna backs up the deck level and vessels working alongside. The architecture comes from offshore projects actually delivered, and is tailored to the size of the facility and the class society or owner specification.
Two-way radio on an offshore project is never delivered alone: the dispatch console goes into the central control room, voice ties into recording and the PAGA system, and network management joins the platform's monitoring. We complete the interfacing and joint commissioning to the owner's and the EPC's specifications.
Offshore facilities are expensive and their modification windows are narrow, so antenna positions have to be right the first time. We complete the coverage study deck by deck and compartment by compartment at drawing stage, delivering drawings and calculations that drop straight into the EPC design package.
Explosion-proof equipment for hazardous modules
Enclosures for salt-spray conditions
Process, utility and accommodation areas
Alerts with location for lone workers
The questions we hear most often on selection, certification and delivery.
Didn’t find your question? Ask an engineer →Offshore platforms combine hazardous process modules, dense steel structures and salt-spray exposure, so equipment must be both explosion-proof and corrosion-resistant.
Yes. Fiber-fed remote units and antennas are placed in modules, stairwells and below-deck spaces where outdoor antennas cannot reach.
Radios with man-down and SOS functions send alerts to the control room; with NetFlex the alert shows the worker’s location.
Channels and talk groups can be configured for platform crews, marine operations and visiting vessels on the same infrastructure.